  • 5.1 Petroleum Refining - United States Environmental

    oil is used in functions vital to the operation of the refinery. Examples are boilers, waste water treatment facilities, hydrogen plants, cooling towers, and sulfur recovery units. Products from auxiliary facilities (clean water, steam, and process heat) are required by most process units throughout the refinery.Learn More

  • Waste Heat Boiler - an overview | ScienceDirect Topics

    Heat absorbed by water = 0.95 Vs(t 1 − t 2)MJ s −1,. t 1 and t 2 = temperature of hot gases before and after the W.H. boiler, °C.. Total heat as steam = sensible heat in feed water + heat absorbed by water in boiler. In good practice t 2, the temperature at which the flue gases leave the boiler, may be reduced to ca.50 K above the temperature of the water in the boiler.Learn More

  • Claus waste heat boiler economics Part 1: process

    There are many parameters in Claus WHBs that need to be very carefully considered in the design phase. Many of the parameters are mutually interdependent – changing one affects several others. In a typical WHB design, the tube size and process-side mass velocity will be chosen to meet a fixed outlet temperature specification.Learn More

  • What is Boiler? Boiler Components - Thermodyne Boilers

    What is a Boiler? Boiler Definition . Boilers are defined as "Boiler is a closed vessel in which water or other liquid is heated, steam or vapor is generated, steam is super-heated, or any combination thereof, under pressure or vacuum, for use external to itself, by the direct application of energy from the combustion of fuels, from electricity or nuclear energy.Learn More

  • Factors Affecting Claus Waste Heat Boiler Design and Operation

    Factors Affecting Claus Waste Heat Boiler Design and Operation Sulphur 2018 International Conference & Exhibition (Gothenburg 5-8 November 2018) 3 Tubesheet thickness. Materials of Construction. Welding techniques for the tube-to-tubesheet welds. Kettle versus Thermosiphon design considerations.Learn More

  • Claus waste heat boiler economics Part 2: mechanical

    Radiative heat transfer coupled with the exothermic recombination reactions collectively increase the peak heat flux at the front of the boiler well above predictions from models that ignore or discount some (or all) of these factors.1 Greatly elevated tube wall temperatures well downstream of the area of protection provided by ceramic ferrules for the higher mass velocity …Learn More

  • (PDF) A Simulation of Claus Process Via Aspen Hysys for

    May 05, 2016 · mal reaction furnace, a waste heat boiler, and a series of catalytic (Claus) reactors and condensers (se e Figure 2). The overall reaction characterizing the process is shownLearn More

  • DESIGNING A ROBUST WASTE HEAT BOILER

    tube type waste heat boiler (WHB). The reliability of the WHB is a significant factor in the overall SRU reliability. Understanding the root causes for WHB failures provides the basis for establishing the parameters necessary for a robust WHB design and also operating guidelines needed for reliable operation.Learn More

  • Water Handbook - Boiler Blowdown Control | SUEZ

    There are many mechanical factors that can affect the blowdown control limits, including boiler design, rating, water level, load characteristics, and type of fuel. In some cases, the blowdown control limits for a particular system may be determined by operating experience, equipment inspections, or steam purity testing rather than ASME or ABMA Learn More

  • Claus waste heat boiler economics Part 1: process

    Claus waste heat boiler economics Part 1: process considerations. The design of the waste heat boiler has a critical role to play in determining process operations, reliability and economic performance in the sulphur recovery unit. Higher sulphur feedstocks offer margin advantages to refiners and gas producers but with challenges to uptime Learn More

  • Waste Heat Boilers and Sulphur Condensers in the Sulphur

    Waste Heat Boilers and Sulphur Condensers in the Su lphur Process Industry: Facing the Large Plant Capacity Trend • This parameter must always be considered • The controlling variables are: a) Design thermal flux at the boiler inlet b) Thickness of the tubes c) …Learn More

  • Sulfidation Corrosion in a Claus Waste Heat Boiler

    Sulfidation corrosion in Claus Waste Heat Boilers (WHB) is one of the leading causes of unexpected fail- factors is heat flux. Heat flux is the rate at which heat is version stage SRU with a front side split design on the re-action furnace (the plant processes Sour Water Acid Gas with high ammonia), and a two-pass WHB.Learn More

  • Claus Plant - an overview | ScienceDirect Topics

    Alireza Bahadori Ph.D., in Natural Gas Processing, 2014. 11.8 Waste heat recovery operation. Most Claus plants cool the process gases, leaving the combustion section by generating steam in a fire-tube waste heat boiler. Steam pressures usually range between 1035 and 3450 kPa (ga). The waste heat boiler outlet temperature is therefore normally above the sulfur dew point of …Learn More

  • Digital Refining - Optimized Gas Treating

    Factors affecting Claus waste heat boiler design and operation. The Claus Waste Heat Boiler (WHB) is a critical piece of equipment in a Sulphur Recovery Unit (SRU); its fundamental purpose is as a heat transfer device Learn More

  • Boiler Corrosion - an overview | ScienceDirect Topics

    The optimum concentration of caustic soda appears to decrease as boiler pressure rises. Since other factors such as heat flux, water purity, and boiler design are thought to affect the stability of magnetite films, there is some uncertainty about precise values, but Table 3 probably reflects present-day trends.Learn More

  • Claus waste heat boiler economics Part 1: process

    Radiative heat transfer, coupled with the exothermic recombination reactions, collectively increase the peak heat flux at the front of the boiler well above predictions from models that ignore or discount these factors. Ceramic ferrules are often used to protect the front end of the tubes from excessive heat, but detailed modelling shows that,Learn More

  • Boiler Efficiency Improvement & Heat Loss Explained in

    Boiler Efficiency Improvement Steps: After Analyzing heat losses in industrial boilers, boiler engineers or technicians can help you to increase your boiler efficiency by 6% – 10%.. Here are the few boiler efficiencies boosting steps listed below:. Complete combustion of fuel so that no unburnt is left behind is a good practice and will add to the boiler efficiency.Learn More

  • BC Insight - Nitrogen+Syngas, Sulphur, Fertilizer

    Waste heat boilers fail because we try to operate them at levels beyond which we can adequately design and safely control them to provide reliable operation. Typically waste heat boilers (WHBs) fail due to three factors: excessive temperature, excessive mass …Learn More

  • New insights into Claus waste heat boilers - DigitalRefining

    New insights into Claus waste . heat boilers. The real plant performance of a waste heat boiler depends on many factors besides heat transfer. The Claus waste heat boiler (WHB) is a critical piece of equipment in the sulphur recovery unit (SRU). As processors move towards higher sulphur feedstocks, more load is placed on the SRU, and WHB Learn More

  • Alloy 22 in Claus Technology - NeoNickel

    Alloy 22 in Claus Technology Sometimes operating temperatures could vary from 20°C through to 300°C or even above 950°C in the waste heat boilers and combustion chambers. Corrosion rate for Refinery Industry. Vaporiser 95°C for 2 months. Factors affecting gasket selection for stainless steels in seawater;Learn More

  • Boiler – Fundamentals and Best Practices

    total heat of steam does not vary a great deal as the boiler pressure increase The boiling point (b.p.) increases as the pressure increases Thus the sensible heat increases as the pressure increases, and the latent heat decreases Boiler pressures are …Learn More

  • Boiler Heat Exchanger and Sulphur Recovery Unit Information

    thermosiphon cooling design, and. steam separation internals. In some systems, like Sulphur Recovery Units (SRUs), waste heat boilers are considered the "weak link"; however, Exchanger Industries has manufactured waste heat boilers that have been in service for over 20 years without needing replacement or extensive maintenance.Learn More

  • Claus waste heat boiler economics Part 2: mechanical

    Claus waste heat boiler economics Part 2: mechanical considerations. The design of a cost effective waste heat boiler faces many, often opposing factors affecting the performance and reliability of the exchanger. To download the full version of this article please subscribe to our Technical Library.Learn More

  • Multi-scale modeling of Claus thermal furnace and waste

    This may have a significant effect on the design of the waste heat boiler and downstream Claus reactors. In this study, the design of thermal reactor and waste heat boiler system is proposed by Learn More

  • Waste Heat Recovery - Energy

    Economies of Scale, Accessibility, and Other Factors Figure 4 ­(A) Metallic Radiation Recuperator Design Figure 11 ­Waste Heat Boiler 17 Figure 12 ­Stack Melter in A Die Casting Facility 17 Figure 13 ­Heat Recovery Curve for Natural Gas­Fired Boiler 18Learn More

  • Assessment of Factors Affecting Boiler Tube Lifetime in

    Assessment of Factors Affecting Boiler Tube Lifetime in Waste- Fired Steam Generators: New Opportunities for Research and Technology Development Ian Wright H.H. Krause Battelle Columbus, Ohio National Renewable Energy Laboratory 1617 Cole Boulevard Golden, Colorado 80401-3393 A national laboratory of the U.S. Department of EnergyLearn More

  • Agenda | CRU Sulphur Conference 2018

    Factors affecting Claus waste heat boiler design and operation The waste heat boiler, a critical piece of SRU equipment, can often become the weak link in the plant, with operators experiencing increasing failure rates.Learn More

  • ePTQ.com

    The design of a cost effective waste heat boiler faces many, often opposing factors affecting the performance and reliability of the exchanger More. Problems in processing discounted crudes Part 2: crude and vacuum columnsLearn More

  • Claus Waste Heat Boiler Economics Part 2: Mechanical

    Claus waste heat boiler economics. Part 2: mechanical considerations The design of a cost effective waste heat boiler faces many, often opposing factors affecting the performance and reliability of the exchanger. Nathan A Hatcher, Clayton E Jones, Simon A Weiland, Steven M Fulk and Matthew D Bailey Optimized Gas Treating, Inc.. T he Claus waste heat boiler lectively …Learn More

  • Claus waste heat boiler economics Part 2: mechanical

    Heat flux, tube wall temperature, and corrosion implications. Heat flux is a very important fac- tor in the reliability, life cycle cost, and the safe long term operation of the WHB. Heat flux varies greatly along the tube length; it is highest at the process inlet …Learn More